Construction dryer BT

The moisture developing in new buildings due to rain moisture, setting water or wallpaper paste frequently requires the use of technical drying. On a space of 120 sqm, there is about 1,500 litres of superfluous water or up to 200 litres per sqm of building material, depending on the type of building material, at the end of the building time. The consequence: The buildings cannot dry completely anymore. The solution: Technical drying and/or building climatisation.

HEYLO offers here professional quality for fast drying of new buildings - with lightweight plastic housing and condensate feed pump or robust metal housing and a large tank.

  • Default
  • Title
  • Date
  • Random